Derived maker summary

Tier IIIThe British Bench editorial classificationDerived directory summary — all eligible current families share this published physical tier

Clemence Watches

Scottish independent watch company designing and hand-assembling current Munro and Photic MKII watches in Britain.

Editorial classification

The British Bench editorial classification

The British Bench records documented facts about where design, development, component manufacture, assembly, regulation, testing, quality control and related work take place, then applies its own editorial provenance methodology to those facts. A tier is an editorial classification only. It does not determine whether a watch, company or claim is legally British or British-made; assess compliance with origin, advertising or consumer-protection rules; certify or approve a product or maker; or measure quality, value, legitimacy or company nationality. A higher tier confers no legal status, certification, approval or endorsement. A lower tier does not mean a less-British company, a worse watch, misconduct or an improper or unlawful origin claim.

Headline decision

Tier III

All 2 current production families share this published tier.

Summary scopeDerived current-production families
Evidence statusShown per physical route
Coverage2 of 2 current families classified
SourcePublished CMS record
  • All 2 current production families share this published tier.
  • Tier III is a directory summary derived from the current family classifications below; it does not transfer a physical tier between watches.

Documented factual findings

What happens within the qualifying territory

Published operations are shown here; the route cards identify how The British Bench interprets them for each physical tier.

Watch assemblyDocumented — attributable published primary source

British hand assembly of Munro and Photic MKII

Clemence states that Munro and Photic MKII are assembled by hand in Britain.

Britain; exact current watchmaker/site not publicly itemised on the reviewed model pages
Functional testingDocumented — attributable published primary source

Clemence current-family testing and inspection in the British route

Clemence documents testing/inspection of current watches in its British-led production route; the complete final-test checklist is not public.

British production route; exact test station and sequence not publicly itemised

Documented factual findings

What is made or completed elsewhere

Documented imported components and international specialist work remain visible beside domestic operations.

No international operation is currently established in the published record.

Unknown and unresolved

What the available evidence does not establish

These fields remain Unknown rather than being converted into a negative fact, inferred location or assumed production route.

RegulationDocumented — attributable published primary source

Three-position regulation for Munro and Photic MKII

Clemence publishes three-position regulation to a minimum +/-12 seconds/day; the post-casing sequence and regulation location require confirmation.

Not publicly stated at sufficient process depth

Route-level decisions

Where the physical classification changes

The maker summary never replaces these model- and collection-level decisions.

Current published routes2 decisions
Tier III

Photic MKII

Collection · Provisional — strong evidence with defined gaps

Current and orderable

The British Bench’s editorial interpretation

  • Current first-party material states that this Clemence route is assembled by hand in Britain rather than imported as a completed watch head.
  • Clemence publishes three-position regulation to a minimum ±12 seconds/day for the Miyota 9039 route and documents British-route testing and inspection/final testing.
  • The evidence supports a substantive British assembly, regulation and testing route; the exact post-casing acceptance sequence, corrective recheck and release traceability remain defined gaps, so the classification is Provisional rather than Confirmed.

International work

  • The route uses a Japanese Miyota 9039 movement; no qualifying British manufacture of a principal component family is established by the reviewed current evidence.

Why the next tier is not met

  • Tier II is not supported because the reviewed current evidence does not establish repeatable British manufacture of a qualifying principal component family such as the movement/substantial mechanism, case, dial or complete hand set.

Evidence gaps

  • The public record states three-position regulation to a minimum ±12 seconds/day but does not explicitly establish that this acceptance measurement occurs after final casing in Britain.
  • The corrective regulation/rework or controlled rejection rule and mandatory timing recheck after intervention are not publicly itemised.
  • Testing/inspection and final-testing language are now public, but the complete completed-watch functional checklist and formal final pass/fail release authority are not.
  • Serial-number or controlled-batch final-QC traceability is not publicly stated; production pressure-test method/scope/location also remains unstated for the 150m/200m families.

Documented factual findings attached to this route

Documented — attributable published primary sourceBritish hand assembly of Munro and Photic MKII

Clemence states that Munro and Photic MKII are assembled by hand in Britain.

Britain; exact current watchmaker/site not publicly itemised on the reviewed model pages
Documented — attributable published primary sourceThree-position regulation for Munro and Photic MKII

Clemence publishes three-position regulation to a minimum +/-12 seconds/day; the post-casing sequence and regulation location require confirmation.

Not publicly stated at sufficient process depth
Documented — attributable published primary sourceClemence current-family testing and inspection in the British route

Clemence documents testing/inspection of current watches in its British-led production route; the complete final-test checklist is not public.

British production route; exact test station and sequence not publicly itemised

Identifiable evidence supporting this route

Tier III

Munro

Collection · Provisional — strong evidence with defined gaps

Temporarily unavailable

The British Bench’s editorial interpretation

  • Current first-party material states that this Clemence route is assembled by hand in Britain rather than imported as a completed watch head.
  • Clemence publishes three-position regulation to a minimum ±12 seconds/day for the Miyota 9039 route and documents British-route testing and inspection/final testing.
  • The evidence supports a substantive British assembly, regulation and testing route; the exact post-casing acceptance sequence, corrective recheck and release traceability remain defined gaps, so the classification is Provisional rather than Confirmed.

International work

  • The route uses a Japanese Miyota 9039 movement; no qualifying British manufacture of a principal component family is established by the reviewed current evidence.

Why the next tier is not met

  • Tier II is not supported because the reviewed current evidence does not establish repeatable British manufacture of a qualifying principal component family such as the movement/substantial mechanism, case, dial or complete hand set.

Evidence gaps

  • The public record states three-position regulation to a minimum ±12 seconds/day but does not explicitly establish that this acceptance measurement occurs after final casing in Britain.
  • The corrective regulation/rework or controlled rejection rule and mandatory timing recheck after intervention are not publicly itemised.
  • Testing/inspection and final-testing language are now public, but the complete completed-watch functional checklist and formal final pass/fail release authority are not.
  • Serial-number or controlled-batch final-QC traceability is not publicly stated; production pressure-test method/scope/location also remains unstated for the 150m/200m families.

Documented factual findings attached to this route

Documented — attributable published primary sourceBritish hand assembly of Munro and Photic MKII

Clemence states that Munro and Photic MKII are assembled by hand in Britain.

Britain; exact current watchmaker/site not publicly itemised on the reviewed model pages
Documented — attributable published primary sourceThree-position regulation for Munro and Photic MKII

Clemence publishes three-position regulation to a minimum +/-12 seconds/day; the post-casing sequence and regulation location require confirmation.

Not publicly stated at sufficient process depth
Documented — attributable published primary sourceClemence current-family testing and inspection in the British route

Clemence documents testing/inspection of current watches in its British-led production route; the complete final-test checklist is not public.

British production route; exact test station and sequence not publicly itemised

Identifiable evidence supporting this route

Source ledger

What this record rests on

Named public sources and public-safe disclosures of confidential reliance are shown without exposing private evidence. The letter is the methodology evidence band, not a product-quality score.

Back to all makers